Strategy is conceived based on the tender assumptions, site conditions, existing organizational resource pool and backed by various resource productivity matrix
Preparation of L0 to L5 schedule
Detailed schedule is prepared including Milestones, Macro, Micro detailing, Resource loading, cost loading and risk identification
Detail logistics planning
Detailed logistic plan is prepared based on tender stage assumptions during the preparation of resource loaded schedule. The plan includes all the aspect of logistics to execute the work as per schedule timelines
Project Forecasting using planning tools
Future planning is done for progress and resources using various windows of six, three, one month and fortnight
Detailed Productivity mapping
Daily mapping of the resource’s output on site and analysis by our experts to increase their productivity
Project Monitoring using “Intento-Projects” mobile app
Intento Projects mobile app is a unique addition to the construction industry to get the analyzed site information in a simplest form. Includes health chart with progress, billing, resources details, requirements and performance across various window sections
Effective resource management
Available resource performance mapping against timelines and required output on daily basis. Resource performance matrix is mapped, and resources are allocated based on the requirement and expectations
Earn Value management
The resource and cost loaded schedules are monitored and studied by our planning experts to show financial health of the project
Delay Analysis
Delay analysis is done with the help of issue tracker in Intento Project app. Impact of all the issues on the project timelines are mapped and analyzed using Primavera, BIM; keeping in mind validation of EOT with / without cost implication